BuySellBlogBrowse Listings

9 Island Ave 1814Miami Beach, FL 33139

For Sale

$2,899,000

Smart Buyer Rebate $28,990

Skip the wait—step into rare 3BD/3BA designer perfection with panoramic water views on Belle Isle! Fully furnished or not & interior-designer styled, this 2,388 SF showpiece was gutted to the studs and rebuilt with luxury finishes, chef-inspired kitchen, and sweeping views. Kitchen offers expansive cabinetry, coffee & breakfast bars, wine fridge, and open flow to living/dining areas. Floor-to-ceiling impact windows + 3 balconies capture sunsets. Primary Suite w/seating area, walk-in closet, spa bath. Full-size laundry/storage, 2-zone AC, water filtration, porcelain plank floors. Iconic resort-style building renovated top-to-bottom (pool/hot tubs underway) with gym, conference/play/social rooms, doorman, valet. Steps to Sunset Harbour, Lincoln Road & The Standard. 2 covered parking spaces.

Listed by Renee M Grossman

·

License #3330933

·

LPT Realty, LLC

·

305-804-4302

Last updated September 03, 2025

·

Source: MIAMIRE #A11855390

Listing Facts

  • TypeCondo
  • NeighborhoodBelle Isle
  • Bedrooms3
  • Bathrooms3
  • Days on Prevu29
  • HOA/Maint. Fees$2,991/month
  • Taxes$30,430/year
  • Size2,388 sqft
  • Price per sqft$1,214

Amenities

  • Dishwasher
  • Private Outdoor Space
  • Washer/Dryer
  • Pets Allowed
  • Air Conditioning
  • Bike Storage
  • Parking
  • Swimming Pool

Location

Mortgage Calculator

Listing History

08/08/2025
Listed by LPT Realty, LLC
$2,899,000

Property Details for 9 Island Ave 1814

Association

Amenities

  • Association Amenities: Barbecue, Bike Storage, Boat Dock, Community Room, Elevator(s), Exercise Room, Heated Pool, Marina, Pool, Sauna, Spa/Hot Tub, Tennis Court(s), Trash Chute, Vehicle Wash Area
  • Pets Allowed: Restrictions Or Possible Restrictions

Fees

  • Association Fee: $2,991.00 Monthly
  • Association Fee Includes: All Amenities, Building Exterior, Cable Tv, Common Area, Elevator, Insurance, Internet/Wi Fi, Parking, Pest Control Interior, Reserve Fund, Security, Sewer, Trash Removal, Water

General

  • Number Of Units In Community: 269

Exterior

Construction

  • Number Of Units Total: 269
  • Property Attached: Yes
  • Stories Total: 24
  • Structure Type: Condo 5+ Stories, Condo
  • Window Features: Clear Impact Glass, Complete Impact Glass, Blinds, High Impact Windows, Impact Glass
  • Year Built: 1981
  • Year Built Details: Resale
  • Architectural Style: High Rise
  • Building Name: Nine Island Avenue
  • Construction Materials: CBS Construction
  • Entry Level: 18
  • Entry Location: Foyer
  • Exterior Features: Open Balcony

Features

  • Direction Faces: West
  • Patio And Porch Features: Open Balcony
  • View: Bay, Intracoastal View, Skyline
  • Waterfront: Yes

Measurements

  • Building Area Total: 2,388
  • Building Area Units: Square Feet
  • Frontage Type: Bay
  • Lot Size Units: Square Feet

Financial

Taxes

  • Parcel Number: 02-32-33-053-2340
  • Tax Annual Amount: $30,430.00
  • Tax Year: 2024

Interior

Features

  • Appliances: Dishwasher, Disposal, Dryer, Ice Maker, Microwave, Electric Range, Refrigerator, Self Cleaning Oven, Wall Oven, Washer
  • Interior Features: Interior Hall, Lobby, Bar, Built-in Features, Closet Cabinetry, Entrance Foyer, Pantry, Volume Ceilings, Walk-In Closet(s)

Measurements

  • Living Area: 2,388
  • Living Area Units: Square Feet

Rooms

  • Bathrooms Full: 3
  • Bathrooms Total Integer: 3
  • Bedrooms Total: 3

Other

Location

  • Subdivision Name: NINE ISLAND AVENUE CONDO

Parking

Parking

  • Attached Garage: Yes
  • Covered Spaces: 2
  • Garage Spaces: 2
  • Garage: Yes
  • Parking Features: Assigned, Covered, Valet

Schools

Elementary School

  • Elementary School: North Beach

High School

  • High School: Miami Beach

Middle or Junior School

  • Middle Or Junior School: Nautilus

Utilities

Equipment

  • Cooling: Central Air
  • Has Cooling: Yes
  • Heating: Central
  • Has Heating: Yes
  • Other Equipment: Automatic Garage Door Opener

Based on information from Miami Association of REALTORS and/or other sources. All data, including all measurements and calculations of area, is obtained from various sources and has not been, and will not be, verified by Prevu or the MLS. Information is provided exclusively for consumer's personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumer may be interested in purchasing.

Full MLS Disclaimers

Rebate estimate is indicative only and based on listing price and estimated buyer's agent commission paid by owner, if applicable. Final rebates are subject to Terms of Use and may vary due to final negotiated transaction terms.