Just completed, this extraordinary Modern French home is on a fully level acre close to the Los Altos Village. Every detail reflects exceptional quality - from hand-finished cabinetry to curated lighting and exquisite materials throughout. Designed for luxury living and entertaining, the home spans two levels connected by elevator, with expansive outdoor spaces on each floor for seamless indoor/outdoor flow and remarkable natural light. The home has 6 bedrooms, 6 full baths, and 2 half baths including main-level primary suite. Also, a 1-bed, 1-bath ADU with full kitchen. There is a stunning great room, designer kitchen with Lacanche range, separate catering kitchen, office or library, tremendous recreation/media room with full bar, fitness center, and golf/sports simulator or movie room. There is a pool (being completed) and fireplace terrace. Solar power in the main home, radiant heat throughout, air conditioning on main level, forced heat and air in ADU, plus garage parking for 4 cars. An exceptional offering in a most sought-after location with access to excellent Los Altos schools.
Listed by Kathy Bridgman
·
License #01189798
·
Compass
·
650-868-7677
Listed by Edward Graziani
·
License #01081556
·
Compass
Last updated September 08, 2025
·
Source: MLSListings #ML81997442
Listing Facts
TypeSingle-family
NeighborhoodLos Altos Hills
Bedrooms6
Days on Prevu106
Size9,219 sqft
Price per sqft$2,169
Amenities
Private Outdoor Space
Pets Allowed
Parking
Swimming Pool
Location
Mortgage Calculator
Listing History
07/25/2025
Status changed to Active
$19,995,000
07/01/2025
Status changed to Pending
$19,995,000
06/11/2025
Status changed to In Contract
$19,995,000
05/27/2025
Listed by Compass
$19,995,000
Property Details for 26321 Alexander Place
Exterior
Construction
New Construction: Yes
Roof: Flat, Other
Stories: 1
Year Built: 2025
Year Built Details: 6
Features
Fencing: Complete Perimeter
Patio And Porch Features: Back Yard, Balcony/Patio, Barbecue Area, Fenced, Fire Pit, Drought Tolerant Plants
Pool Features: Cover, Gunite, Heated, In Ground, Sauna Or Steam Room
Parking Features: Attached Garage, Electric Car Hookup, Off-Street Parking, Parking Area
Schools
Elementary School
Elementary School: Gardner Bullis Elementary
Elementary School District: Los Altos Elementary
High School
High School: Los Altos High_1
High School District: Mountain View-Los Altos Union High
Middle or Junior School
Middle Or Junior School: Ardis G. Egan Intermediate
Utilities
Equipment
Cooling: Ceiling Fan, Multi-Zone
Heating: Gas, Radiant Floors
Laundry Features: Tub / Sink, Inside
Sewer: Public Sewer
Utilities: Natural Gas Available, Water - Public
Water Source: Public
Based on information from MLSListings™️ and/or other sources. All data, including all measurements and calculations of area, is obtained from various sources and has not been, and will not be, verified by Prevu or the MLS. Information is provided exclusively for consumer's personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumer may be interested in purchasing.
Rebate estimate is indicative only and based on listing price and estimated buyer's agent commission paid by owner, if applicable. Final rebates are subject to Terms of Use and may vary due to final negotiated transaction terms.